Знания и опыт
         в прогресс и эффективность

Fortum receives equipment just-in-time

30 Июня 2015
EnergoFront, JSC keeps supplying equipment to Chelyabinskaya GRES (Fortum, OJSC) for building of two power generating units PGU-247,5 mW.

Six pumps Omega, two pumps Etanorm and one pump Multitec by KSB Company (Germany) have been already supplied.  Three frequency drive units by ABB meant for pump capacity control have been supplied too.

During this project EnergoFront specialist provided with the full technical information for detailed engineering and the whole range of technical documentation for pumps handover to production.

EnergoFront Service specialists will provide supervising installation and commissioning of unit pumps.

Поделиться:

Самые интересные
места и события
Заказать звонок
Удобное для вас время звонка по Москве
Поля, обязательные для заполнения
Обратная связь
Поля, обязательные для заполнения
Запрос
Поля, обязательные для заполнения