Знания и опыт
         в прогресс и эффективность

HYOSUNG equipment earns trust with HMS Group

6 августа 2014
Joint venture of JSC “TGK-2” and Chinese corporation Huadian (China), JSC “Huadian-Teninskaya TPP” , continues construction of new energy unit of steam and gas set-450 in Yaroslavl. The main equipment consists of 2 gas turbines ГТЭ-160 MW produced by JSC “Power machines”, 2 turbo generates produced by Siemens, 2 steam waste boilers by JSC “ZIOMAR” and 1 heat recovery steam turbine 150 MW with AC turbo generate.
Equipment produced by leading Russian holding JSC “HMS Group” was chosen as feeding pump for waste boilers. Four pumps will be completed with electric motors of leading Korean producer HYOSUNG. JSC “EnergoFront” will make supply, technical forwarding, commissioning and start-up. Start-up of the new energy unit will allow  solving  the problem of energy deficit in the capital of the region, increasing reliability of energy supply of consumers, and making more than 100 new working places.

Поделиться:

Самые интересные
места и события